Monday 15 December 2014

JNTUK (KAKINADA) 4-1 B.Tech R10 Regular Supply Evaluation Status Results Information

 jntuk fast updates
JNTUK (KAKINADA) 4-1 B.Tech R10 Regular Supply Evaluation Status Results Information

Hello Friends Good News: JNTU Kakinada University started the JNTUK 4-1 B.Tech (R10) Regular/Supply Evaluation From 27-11-2014.


The Valuation of papers Correcting through Manual Only. The Spot Valuation For The Following Subjects Are Going To start From 27-11-2014. So, The Results Will May Release with in Short Span of Time Like with in 40 Days {According to Our Expectation}. At present Phase-III running Now 12-12-14. Results released information mention Here.

Phase-I:
In this Phase The Following Subjects are Going to be Evaluated From 27.11.2014

The following subjects spot valuation doing on 27-11-2014.
  • computer organizations
  • UML & Design Patterns
  • Refrigeration and air condition
  • Geo technical Engineering-II
  • Embedded Systems
  • Design and Drawing of irrigation Structures
  • High Voltage Engineering
  • Optical communications
  • Cryptography & Network Security
  • Design patterns
  • CAD/CAM

Phase-II:
In this Phase The Following Subjects are Going to be Evaluated From 5.12.2014

The following subjects spot valuation doing on 05-11-2014.
  • Environmental Engineering
  • Remote Sensing and GIS Applications
  • Switch Gear & Protection
  • Power System Operation & Control
  • Alternative Sources of Energy
  • Unconventional Machining Processes
  • DIGITAL IMAGE PROCESSING
  • RADAR SYSTEMS
  • Data Ware Housing and Data Mining
  • Mobile Computing
  • Process Modelling and Simulation
  • Computational Methods in Chemical Engineering
  • Systems Programming

Phase-III:
In this Phase The Following Subjects are Going to be Evaluated From 12.12.2014
  • Earthquake Resistant Design
  • Ground Improvement Techniques
  • Urban Transportation Planning
  • VLSI Design
  • Electrical Distribution Systems
  • Optimization Techniques
  • Automobile Engineering
  • Computational Fluid Dynamics
  • Condition Monitoring
  • Rapid Prototyping
  • TELECOMMUNICATI ON SWITCHING SYSTEMS
  • ANALOG IC DESIGN
  • OBJECT ORIENTED PROGRAMMING
  • Computer Forensics
  • Cloud Computing
  • Software Project Management
  • Machine Learning
  • Distributed Databases
  • &OPEN ELECTIVES
Results Released Date: Last week of Dec 2014 to First week of January 2015 ( This date not official,  only estimation)

Already jntuk b.tech 4-1 internals marks date send to respective colleges [Correction or modification purpose]. Final Internals Marks released with 5 days. Internal marks Released or shown only Respective Colleges notice board or official college web site.

Stay Tuned JNTUK 4-1 B.Tech [R10] Regular/Supply Evaluation Status & Results information Here